Nail it up and let er dry on the wall.
Proper installation of board and batten siding.
With a helper expect to spend a day installing 800 square feet of siding.
First prepare the area by following these steps.
Scrape away old caulking around the doors and windows.
Rdesigns suggests the traditional method.
Board and batten can be installed onto solid plywood or osb sheathing.
Vertical board batten siding installation instructions proper fastening everlast is a fl oa ng siding system that accommodates ver cal expansion and contrac on.
Having the wrong size can further complicate the installation process.
In the photo you see the sticker stain from green stickers on green wood that was allowed to be rained on before installation.
Vertical board batten siding installation instructions best practice if exterior walls are not fl at or level a quality underlayment should.
Nail the boards and battens.
Install wide vertical boards typically 6 to 12 space 1 2 to 1 between boards to allow natural movement between.
In addition to applying stain to both sides and all edges nailing both boards and battens correctly also is key.
With wider boards increase batten overlap proportionately.
For 12 wide use no less than 2 inch battens.
If your sheathing is not solid you will need to first attach horizontal furring strips.
Installing board batten siding board and batten is a vertical pattern created using cedar boards and battens of various widths for a wide range of appearances.
Traditionally board and batten siding starts with wide vertical planks boards which are then joined together by thin vertical strips battens to cover the seams.
On 12 wide boards put two nails about 3 inches apart in the middle and make sure the nail for the batten goes between the boards.
For nominal 6 inch boards spaced inch apart battens should overlap by a least 1 2 inch.
Using a short one can compromise stability while using a longer one increases the chances of splitting edges.
After that make sure your home is ready for the siding installation by removing the rotten boards and securing the.
Paint or stain your board and battens if they aren t colored already.
Homesteaders and farmers would use sawmills to cut the long boards and the battens were put in place to make the structure as airtight as possible.
Before mounting your boards and battens make sure the nails you re using are of the right size.
Before you begin cover the sheathing with building wrap and install trim boards and flashings.