Mother nature oxidation dirt dust and road salt all take their toll on even the thickest of metals.
Putting new metal siding on my trailer.
Cut the first piece of siding and install it over the starter strip.
Continue with each subsequent piece of siding until the mobile home is complete.
Over the years we ve re skinned many trailers to make them.
13 colors are available and we offer a wide range of pre cut heights for convenient ordering.
We specialize in manufacturing our rv parts in just 24 to 48 hours.
All rite offers a wide range of custom made rv aluminum siding built to your exact specifications.
Make sure there s a gap of about one eighth of an inch with each piece of siding to allow for overlap.
So when you need to repair or replace your metal rv siding quickly you can count on all rite.
Don t buy a new trailer.
Good life rv is iowa s top rv service and repair facility.
Insert a bolt with a washer through one of the holes and tighten it in place with a nut and socket wrench.
235 75r15 apex off road tire on black mod wheel 5.
If your trailer is 8 feet long for example trim the osb board using a power saw to 8 feet in length.
Note skin sheets with crimps locks or brakes can not be shipped.
Once you have that measurement add 2 1 4 inches to it for each s lock you have to deal with.
Trim a sheet of osb board to the length of your trailer.
Lay the siding starter strip on the chalk line and hammer in a nail about every 10 inches.
We repair all kinds of campers and even have a rv body.
Now if there is no metal frame covering your siding then you would have to measure your siding from s lock to s lock.
Then add 2 3 4 inches for each frame and s lock that covers your siding section.
One major stipulation with the james hardie siding warranty is that it specifically states that if.
Removing existing siding and installing osb has several benefits such as having brand new substrate on the home and the ability to inspect the wall cavity and all framing insulation and structural integrity of the home before replacing siding.
Factory rvda and rvia trained technicians.
What you do is measure your siding from frame to frame.